As an experienced product oriented design studio, we are pleased to offer you a holistic design approach based on a modular system that can be adapted precisely to your individual requirements.

Black and silver electric food chopper with control dials on a dark background.

Product and Industrial Design

A pile of small, white, irregularly shaped pellets.

Sustainability

A person standing next to a large, futuristic green vehicle in a field with trees and mountains in the background, with part of a blackboard or presentation board showing car sketches on the left side.

Designing with generative AI

A person using a smartphone to monitor e-bike ride stats, showing 18 km/h speed, 49 km distance, 1 hour 20 minutes trip, and 15 minutes 20 seconds time, on a cycling display.

Digital Design and User Interfaces

Two people assembling or packaging boxes and envelopes on a wooden table in a bright room.

Packaging Design

Person attaching pink and purple sticky notes with handwritten German text to a wall, wearing a yellow smartwatch.

Design Research & Strategy

Futuristic black autonomous vehicle with large rugged wheels in a field with hay bales and trees in the background.

Visualisation

A split image showing the difference between a 3D wireframe model and a rendered 3D model of an iron on a pink surface.

Market Launch and Production

WORKING MODELS

Our Way of Working

Over the years we have developed several working methods. Depending on the characteristics of each project, we decide with our partners on the most suitable approach.

A blue icon of a sprint arrow loop with the text 'Design Sprint' underneath

Design Sprint

Utilizing the agile Sprint Model, we iterate rapidly through design phases, enabling continuous feedback and improvements.

A blue icon showing a vertical flow with three sections and an arrow, labeled 'Waterfall.

Waterfall

The Waterfall Model guides us through each design phase in a step-by-step manner, ensuring completion before progressing to the next.

Ein blaues Icon mit einem vertikalen Fluss mit drei Abschnitten und einem Pfeil, beschriftet mit 'Waterfall

Workshop

Through workshops, we engage in creative sessions, brainstorming, and sketching events to quickly generate and refine ideas.

A simple line drawing of a submarine underwater.

Submarine Projects

Operating below the radar, small agile teams develop ideas rapidly before surfacing with results that win stakeholder buy-in.

Outline of a delivery truck icon

Firefighter Projects

When time is critical, we step in to deliver fast solutions, whether it's urgent designs, visualizations, or presentations. Ready when it matters most.

Outline of a lighthouse with beams of light shining outward.

Lighthouse Projects

Guiding the way forward, these projects illuminate new paths within a company, setting bold visions for the future.